Your dream of a home in the green
Adjacent to the Wulzendorfstraße 103 project, the residential development at Wulzendorfstraße 101 seamlessly integrates with its surroundings. This project offers 80 commission-free, privately financed condominiums and 37 underground parking spaces. The thoughtfully designed layouts of the 2- and 3-bedroom apartments, ranging from 34 m² to 87 m², cater to a variety of needs. Each apartment features private outdoor spaces such as loggias, balconies, terraces, or private gardens.
If you require more living space, feel free to discuss this with the Haring Immobilientreuhand sales team. It is possible to combine vertically stacked apartments into a duplex (4 rooms) or merge adjacent units!
For all owners, even those in the upper floors, there is the special optional opportunity to purchase a private garden plot. All gardens will be equipped with electricity and water connections.
37 parking spaces are available in the building’s underground garage.
The location offers excellent infrastructure: a bus stop just one minute away on foot provides direct access to the U2 subway line. Shopping, educational, and recreational facilities are also just a few minutes away.
All apartments will be handed over turnkey, meaning that all sanitary fixtures, tiles, and parquet floors are included in the purchase price. The heating system is underfloor heating, with an energy-efficient air-to-water heat pump for heat supply. For more details on the apartment features, please refer to the specifications in the booklet.
Ihr Vorteil beim Erwerb einer Haring Group Immobilie:
- Provisionsfrei! Alle Eigentumsobjekte werden ohne Provision (3,6% inkl. MwSt.) angeboten!
Renderings: Symbolic images (c) bildraum.at
Please note that there is a close familial or economic relationship between the broker and the client.
The agent acts as a double broker.
Stiege:
Top: 74
Rooms: 3
Floor: 3. Etage / 3. Obergeschoss
WNFL: 54,70m2
Garden 81,80m2
Balcony: -
Loggia: -
Terrace: 31,10m2
Anzahl Keller: 1
Kellerfläche: 3,40m2
Ausrichtung: Süden
Baubeginn: 2025
Fertigstellung: 30.06.2027