Süßenbrunner Straße 61 | 1220 Wien

Eigentums- und Vorsorgewohnung

TOP 21

GREEN HORIZON

Where life flourishes

 

The residential construction project GREEN HORIZONT, which combines modern ownership with a noticeable proximity to nature, is being built in the 22nd district of Vienna. The 36 commission-free owner-occupied and investment apartments offer, with 2–4 rooms and 36 to 91 m², exactly the space that singles, couples, and families need for a relaxed life. Every apartment features a private balcony, a terrace, or a garden – ideal for enjoying the view of the greenery anew every day.

Inside, a feel-good living quality awaits you: All units are handed over turnkey, equipped with high-quality sanitary elements, stylish tiles, and elegant parquet floors.

For additional comfort, 20 underground parking spaces are available.

The location is particularly noteworthy: The Green Horizon is situated where city and nature harmoniously meet. Just a few steps away, the Hirschstettner Badeteich (bathing pond) invites you for walks, sports activities, or relaxing hours in nature. At the same time, the good public transport connections ensure that urban life remains easily accessible at all times.

Thus, the Green Horizon unites nature-oriented living, a quiet environment, and modern quality of life – a home that brings nature right to your doorstep.

 

Save 3.6% | Buy commission-free

Your advantage when purchasing a Haring Group property:

- Commission-free! All owner-occupied properties are offered without commission (3.6% incl. VAT)!

 

Renderings: Symbolic images (c) zoomvp.at

Please note that there is a close familial or economic relationship between the broker and the client.

The agent acts as a double broker.

>> Read more

Stiege:
Top: 21
Rooms: 2
Floor: 2. Etage
WNFL: 37,54m2
Garden -
Balcony: 6,44m2
Loggia: -
Terrace: -
Anzahl Keller: 1
Kellerfläche: 5,00m2
Ausrichtung: Westen

Kaufpreis Eigennutzer: € 239.500,00
Kaufpreis Anleger netto:
Kaufpreis Anleger brutto:
Provision: Provision bezahlt der Abgeber

Baubeginn: 2026
Fertigstellung: Ende 2028

Location of the project

Send us a non-binding inquiry






    Mail IconSend request